As the airport's prime design consultant, RS&H identified innovative solutions that minimized impacts so that the airport could continue to provide a world-class travel experience for its passengers.
Projects at Colorado Springs Airport included runway rehabilitations, apron rehabilitation, taxiway reconstructions, landside improvements, planning studies, and owner representation.
RS&H provided planning, design, and construction administration services for a Terminal Apron Asphalt and Taxiway E Rehabilitation project at John Glenn Columbus Airport.
This innovative and cost-effective design-build project comprised the design and construction of 6.1 miles of roadway, including a limited access toll road and a non-tolled local road in Lake and Seminole Counties, Florida.
This project consists of the design and construction of a new Fourth Parallel Runway (New Runway 1x-19x) and two End-Around Taxiways (EATS).
RS&H provides on-call planning and consulting services to assist the airport management at King County International Airport-Boeing Field.
RS&H has been an integral part of the airport’s development since 2009, leading significant projects ranging from terminal and apron expansions to new taxiways and landside enhancements, contributing to its position as one of the fastest-growing airports in the United States.
Through a collaborative effort, this space was designed with care and thoughtful attention to tell the story of strength, hope, and love. The bell wall was one such element used to infuse hope into the space. The bell wall represents a significant moment in a patient’s journey through cancer treatment.
RS&H worked with Orlando Health to create a design for a ground-up Outpatient Surgery Center (OSC) in Clermont, Florida. The single-story, 28,000-square-foot building is located immediately behind the hospital and is the first OSC project in the state of Florida reviewed by AHCA.
RS&H was tasked by environmental agencies to design the ends of the bridge to minimize impacts to coastal wetlands in order for the project to be permitted. We had the challenge of designing bridge bent locations to avoid a submerged aquatic vegetation area under part of the bridge.
The interim project will add three new ramps connecting I-4 to Daryl Carter Parkway, including exit ramps from both directions of I-4 to Daryl Carter Parkway and an entrance ramp to eastbound I-4.
The Sawgrass Expressway opened in 1988 but fell three miles short of I-95, forcing vehicles destined for I-95 to utilize the local road networks, including SW 10th Street. Since the original studies, several unsuccessful attempts were made throughout the decades to make this three-mile connection.
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.
If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.
This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.
Keeping this cookie enabled helps us to improve our website.
Please enable Strictly Necessary Cookies first so that we can save your preferences!