Employee ownership is accessible to everyone at RS&H. Learn how we collectively succeed together.

Projects

RS&H provides design and construction administration services for the RDU Park Economy 3 Expansion project, which nearly triples the parking capacity while enhancing environmental performance, sustainability and resilience as demonstrated by Envision Platinum verification and LEED certification.

Aviation

As the prime consultant and engineer of record, RS&H designed this critical extension, which adds approximately 2,300 feet of a new 75-foot-wide taxiway with 30-foot shoulders, resulting in dual parallel taxiways on the north airfield.

Aviation

Partnering closely with Los Angeles World Airports (LAWA), we embarked on the critical task of reconstructing Taxilane C at Los Angeles International Airport (LAX), one of the busiest and most constrained airports in the world.

Aviation

RS&H and the Aurora Fire Rescue teamed up to create facility assessments and prototypes for multiple fire stations throughout the city, inclusive of design and redesign, programming, concept developments, and cost estimation. 

Federal

RS&H stepped in to support the modernization of key buildings and facilities, ensuring that Castle Rock remains well-equipped to meet the demands of its thriving community.  

Federal

The airport worked with the design team to complete all main restrooms, ticketing, and car rental counters, and lower-level modernization.

Aviation

Peaks Recovery Center, an inpatient rehab facility, desired to transform two residential homes, and an RV barn on 11 acres into a comprehensive campus for healing people with addiction and mental health challenges.

Healthcare

RS&H was hired by Peterson AFB to produce two Area Development Plans focusing on the Command Complex and Triangle Areas.

Federal

RS&H was tasked with compiling data for a space utilization report at Peterson AFB, CO. The purpose of the project was to survey 91 buildings totaling 2,033,400 GSF and provide an assessment of existing conditions to establish accurate inventory data.

Federal

The building of the North Colorado Springs Readiness Center (NCSRC) represents the culmination of a successful collaboration between the United States Air Force Academy (USAFA) and the Colorado Army National Guard (COARNG) to locate a National Guard facility on USAFA property.

Federal

RS&H’s Master Planning and GIS Mapping role in the Installation Development Plan process was to produce the IDP document and populate sections concerning installation capacity analysis, sustainable development indicators, future development planning, plan implementation, and GIS mapping for multiple bases.

Federal

RS&H, with prime contractor HDR, completed the Fort Carson Vision Plan and Installation Planning Standards (IPS) – steps one and two, respectively, in a comprehensive and collaborative planning process to create a full Installation Development Plan (IDP) suite.

Federal
RS&H logo in blue.
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.