Fraud Alert: If you received an unexpected job offer from RS&H, please notify us.

Projects

The project team provided an unmatched level of commitment, expertise, and experience crucial to the execution of this unique project in a condensed nine-month timeline. The entire team worked tirelessly to deliver this unique project and restore a vital transportation network to the city.

Transportation

The Lesner Bridge is arguably Virginia Beach's signature bridge and boasts an average annual daily traffic (AADT) count of over 20,000 vehicles. The City of Virginia Beach set a goal to produce a bridge with a 100-year lifespan that incorporated new aesthetics and safety measures.

Transportation

Designing the Concourse B expansion has been a fun and exciting project for the Department of Airports, as well as our designers and visualization specialists.

Aviation

RS&H is currently providing routine bridge and culvert inspection and load rating for NCDOT on a statewide basis.

Transportation

RS&H provided overall project management and coordination and field inspection of the Skyway guideway.

Transportation

RS&H, as the prime CEI consultant, is providing Construction Engineering and Inspection Services for the widening of 5.5 miles of IH 45 between Houston and Galveston from six to eight interstate mainlanes and six lanes of frontage roads.

Transportation

RS&H provided a constructability assessment, Construction Time Determination (CTD) schedule, and Independent Cost Estimate (ICE) for this large urban project involving the construction of an 8 mi. extension to the NYCTA system.

Transportation

RS&H is providing CEI Services for the I-26 Widening project which consists of approximately 9.1 miles of improvements to I-26 from just north of US 64 to just south of NC 280 and ties into the I-26 project to the north.

Transportation

RS&H has been performing bridge scoping and repair recommendations, routine bridge safety inspection, and in-depth bridge safety inspection across five Regions for MDOT since 2019.

Transportation

RS&H’s scope includes assisting with program development, program and project control procedures, training development, and field inspection.

Transportation

This innovative and cost-effective design-build project comprised the design and construction of 6.1 miles of roadway, including a limited access toll road and a non-tolled local road in Lake and Seminole Counties, Florida.

Transportation

The interim project will add three new ramps connecting I-4 to Daryl Carter Parkway, including exit ramps from both directions of I-4 to Daryl Carter Parkway and an entrance ramp to eastbound I-4.

Transportation