RS&H provided multidisciplinary design services for a new F-35A maintenance hangar and supporting airfield infrastructure at Eglin Air Force Base. The project enhances mission readiness with resilient, high-performance facilities designed to support advanced aircraft maintenance and testing operations.
RS&H led the design of the new JIATF-S Headquarters at Naval Air Station Key West, supporting a mission critical to combating illicit trafficking and enhancing regional security. The resilient, mission-focused facility is designed to meet stringent security requirements and withstand Key West’s challenging coastal environment.
RS&H provides design and construction administration services for the RDU Park Economy 3 Expansion project, which nearly triples the parking capacity while enhancing environmental performance, sustainability and resilience as demonstrated by Envision Platinum verification and LEED certification.
RS&H is working with the Florida Department of Transportation to identify and prioritize vulnerabilities to flooding along the corridor and develop concepts to ensure the continuation of service following a flooding event now and in the future.
With RS&H’s support, the TPO has documented 112 million gasoline gallons equivalent (GGE) displacement and over 141,000 tons of GHG emissions – equivalent to the annual emissions of over 30,000 passenger vehicles and $48,000,000 in health benefits.
RS&H performed design and bid phase services to reconstruct Taxiway J from Taxiway Z to Taxiway Y and connect Taxiways K7, K8, and their associated safety areas.
Over the past 30 years, RS&H has supported continuous, data-driven sustainability performance improvement for the Defense Commissary Agency (DeCA), which operates a worldwide network of over 280 commissaries and central distribution centers.
As the airport's prime design consultant, RS&H identified innovative solutions that minimized impacts so that the airport could continue to provide a world-class travel experience for its passengers.
RS&H provided design services for the rehabilitation of 11 miles of Reagan Memorial Tollway (I-88), a 40-year-old roadway that plays a critical role within the local, regional, and statewide transportation system.
RS&H led development of the Customer Criteria Documents (CCD), including preliminary building layouts, and validated the cost estimate for a new 62,000-square-foot Squadron Operations Facility. Upon completion of the CCD, RS&H provided multidiscipline architecture and engineering design services for this new facility.
The Houston Airport System (HAS) operates three airports: George Bush Intercontinental Airport/Houston (IAH), William P. Hobby Airport (HOU), and Ellington Airport (EFD).
This unique airport design changed the image of Tampa as a community and is still regarded today as one of the best terminal designs in the world.