RS&H has acquired Texas-based OMEGA Engineers. Learn more.

Airport Redevelopment: Seeing the Whole Picture

November 18, 2026      

Tags: Aviation

At an airport, no project exists in isolation. A terminal connects to an apron. An apron connects to fueling, drainage, and airfield systems. Landside infrastructure shapes what happens inside the building, and a decision that looks purely architectural can create a ripple effect across the airport. 

In this episode of AEC Perspectives, host Rachel Moore sits down with Max Marble, PE, CM, LEED AP, Senior Principal Airfield Engineer at RS&H, to explore what it takes to see the whole picture when planning major airport redevelopment. With more than 30 years of experience on both sides of airport development, as an airport owner and a consultant, Max brings a rare perspective on the technical, operational, financial, and customer considerations that must come together for complex programs to succeed. 

Max shares real-world examples of just how interconnected some seemingly small elements can be, from a new terminal’s roof drainage creating unexpected flooding to a glass building façade interfering with navigational aid signals. He also explains why something as simple as a sloped terminal floor can reveal the trade-offs happening between airside and landside infrastructure. The common thread is clear: the earlier airport owners understand those connections, the more opportunities they have to address constraints before they become costly changes or operational challenges. 

Success boils down to defining the project around the airport’s larger objectives, bringing the right stakeholders together early, understanding how decisions ripple across interconnected systems, and creating enough flexibility to serve an aviation industry that will continue to evolve.  

Whether you’re an airport owner preparing for a major capital program,  or a partner helping deliver complex aviation improvements, this episode offers a practical perspective on turning a once-in-a-generation investment into long-term value.  

Key Discussion Points 

  • See the airport as one interconnected system. Terminal, landside, and airside development shouldn’t be treated as separate projects.  Each piece is interconnected, so bringing those considerations together early allows teams more options to resolve conflicts before design decisions become expensive to change. 
  • Spend the time upfront to truly define the project. Max explains why understanding the project’s objectives, connected systems, future requirements, and competing priorities at the outset is critical to reducing unintended consequences later. 
  • Successful redevelopment balances critical operations with future planning. Airports can’t stop operating while major improvements are built around them. Teams have to find the right balance between the disruption required to deliver a project and the operational needs that continue throughout construction, all while keeping the project’s larger objective in focus.  
  • Design beyond opening day. Automation, changing passenger expectations, advanced air mobility, and other innovations will continue to reshape aviation. Because a major terminal or apron redevelopment may be a once-in-a-generation investment, flexibility matters. Successful programs don’t just solve today’s problems. They give airports room to adapt to needs and technologies that may not yet be fully defined. 

Stay in the Know

Sign up to receive RS&H and industry news, blogs, case studies, and more in our monthly newsletter.

This field is for validation purposes and should be left unchanged.
Name
Accept GDPR Terms(Required)

Related Insights

In this role, Twibell will lead the design of airfield electrical, navigational aid, power distribution and communication systems for aviation clients.

Aviation

At Denver International Airport, climate resilience is moving from planning to practice. The South Worldport project demonstrates how RS&H used Envision to translate airport-wide climate risks and adaptation strategies into practical design and operational decisions.

Aviation

A vertiport should be planned around a defined operating need—not simply the availability of new aircraft technology. Before identifying a preferred site or advancing a concept, airport leaders should answer five questions. 

Aviation Transportation
Aircraft taking off from vertiport.
News
RS&H Receives NWAAAE Corporate Award of Excellence
October 20, 2026By Jennifer Nix McGerald, FSMPS, CPSM

RS&H has received the Corporate Award of Excellence at the Northwest Chapter of the American Association of Airport Executives (NWAAAE) 2026 Annual Conference in Missoula, Montana.

Aviation
RS&H logo in blue.
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.