Fraud Alert: If you received an unexpected job offer from RS&H, please notify us.

Projects

RS&H is working with the Florida Department of Transportation to identify and prioritize vulnerabilities to flooding along the corridor and develop concepts to ensure the continuation of service following a flooding event now and in the future.

Transportation

With RS&H’s support, the TPO has documented 112 million gasoline gallons equivalent (GGE) displacement and over 141,000 tons of GHG emissions – equivalent to the annual emissions of over 30,000 passenger vehicles and $48,000,000 in health benefits.

Transportation

The Davidson River Village Connector is a new location roadway in the City of Brevard connecting US 64/276 and US 64.

Transportation

The design-build project aimed at reconstructing 14 miles of Interstate 25 (I-25), including overhauling three full interchanges.

Transportation

RS&H designed a new roundabout for the Hardscrabble Green Loop, a segment of the City’s Roswell Loop.

Transportation

RS&H is providing on-call services for toll operations on the Triangle Expressway, Monroe Expressway, I-77 Express Lanes, and future tolled and managed lanes projects.

Transportation

The project team provided an unmatched level of commitment, expertise, and experience crucial to the execution of this unique project in a condensed nine-month timeline. The entire team worked tirelessly to deliver this unique project and restore a vital transportation network to the city.

Transportation

The Lesner Bridge is arguably Virginia Beach's signature bridge and boasts an average annual daily traffic (AADT) count of over 20,000 vehicles. The City of Virginia Beach set a goal to produce a bridge with a 100-year lifespan that incorporated new aesthetics and safety measures.

Transportation

RS&H is currently providing routine bridge and culvert inspection and load rating for NCDOT on a statewide basis.

Transportation

RS&H provided overall project management and coordination and field inspection of the Skyway guideway.

Transportation

Improvements of US 20 BR West State Street consisted of a new four-lane roadway with two lanes in each direction separated by a 22-foot wide landscaped median and features a curb-and-gutter design and an enclosed drainage system.

Transportation

RS&H, as the prime CEI consultant, is providing Construction Engineering and Inspection Services for the widening of 5.5 miles of IH 45 between Houston and Galveston from six to eight interstate mainlanes and six lanes of frontage roads.

Transportation