As states and transportation agencies increasingly use P3 terminology, legislation and approach vary nationally.

Public-Private Partnerships: “Contractual agreements formed between a public agency and a private sector entity that allow for greater private sector participation in the delivery and financing of transportation projects.” – FHWA Office of Innovative Program Delivery

States and transportation agencies are increasing the use of public-private partnerships (P3 or PPP) or tolling and tolled express lanes to advance projects through the use of private capital as the gap between available public funding and investments needed to maintain or rebuild existing infrastructure continues to grow.

Five services are generally required with a transportation project: design, build, finance, operate, and maintain; DBFOM. The traditional approach for public projects is design-bid-build (DBB) with design and build separately contracted and with public finance. The FHWA Office of Innovative Program Delivery has a broad definition of P3, including D-B, DBOM, DBF, DBFOM and O&M Concession. A more restrictive definition in common use is that a P3 is public infrastructure using private finance in a long-term partnering agreement, which excludes D-B and short-term DBF.

There are also several variations of a full-fledged DBFOM. Most transportation P3s rely upon either the concessionaire’s financing being paid through the receipt of toll revenues (the concessionaire taking both demand risk and toll collection revenue risk) or through availability payments from the owner (the concessionaire taking appropriations risk).

States are not consistent in what is defined as a P3. Currently, 33 states and Puerto Rico have P3 enabling legislation for transportation projects. Legislation varies considerably by state for tolling authority, project approval, project cost, leasing, duration, and use of availability payments.

In Florida, P3 projects procured under s.334.30, F.S. include Build-Finance, Design-Build-Finance, and Design-Build-Finance-Operate-Maintain. The finance portion of BF and DBF projects does not imply a long-term commitment by the contractor with the Florida Department of Transportation (FDOT) where finance payments must be within the five-year work program or up to ten years for projects over $500 million. Long-term operate and maintain triggers a statute allowing availability payments for a period up to 50 years, 75 years by exception. FDOT is authorized separately under Section 337.11(7), F.S., to use the Design-Build process, which FDOT considers innovative, but not a P3. D-Bs have become well-established in FDOT with 35 in FY 2014 alone.

Internally, we consider a P3 as a project with a long-term operations or asset maintenance requirement, usually including private finance, such as DBOM, DBFOM, or O&M Concession. D-B and DBF projects are unlike a long-term operate and maintain P3. Owner support services for a D-B or a short-term DBF project generally does not include the complex alternatives analysis, value for money, finance, and operations and maintenance specifications typical with a full P3.

Tolling and financing transportation projects have long been the province of toll agencies. With the increasing use of P3s and tolled managed lanes, state DOTs and other transportation agencies are more engaged in innovative project approaches. This is still a new and developing field and terminology and legislative authorizations should tend to standardize over time.

Stay in the Know

Sign up to receive RS&H and industry news, blogs, case studies, and more in our monthly newsletter.

This field is for validation purposes and should be left unchanged.
Name
Accept GDPR Terms(Required)

Related Insights

The transportation sector is at a pivotal moment. As infrastructure projects grow in complexity and scale, traditional paper-based workflows are proving insufficient.

Transportation
News
RS&H Wins 2026 ACEC Georgia Engineering Excellence Merit Award
March 23, 2026By Jennifer Nix McGerald, CPSM

RS&H has been named a 2026 American Council of Engineering Companies (ACEC) Georgia Engineering Excellence Merit Award, recognizing the firm's exceptional work on the Cumberland Transit Center Site Feasibility Study for the Cobb County Department of Transportation (DOT).

Transportation
Insight
From Blueprint to BIM: 3D Models as Legal Documents
March 4, 2026By John-Mark Palacios, PE

Discover how 3D legal documentation imporves project accuracy, collaboration, and efficiency for transformative infrastructure solutions.

Transportation

In this episode of AEC Perspectives, host Rachel Moore joins RS&H’s National Bridge Inspection and Preservation Leader, Corey Rogers, PE, and In-Service Bridge Inspector, Scott Brown, to explore how unmanned aerial systems are revolutionizing infrastructure maintenance.

Transportation
RS&H logo in blue.
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.