Employee ownership is accessible to everyone at RS&H. Learn how we collectively succeed together.

Modern parking lot with covered walkways, cars, buses, and people walking toward a terminal building.
Expansive parking lot with solar-panel-covered walkways, filled with parked cars.
Bus terminal in large parking lot with landscaped areas and numerous parked cars.

Raleigh-Durham International Airport Park Economy 3 Expansion

Project Details

Solutions

Location

Raleigh, NC

Client / Owner

Raleigh-Durham International Airport

Size

100 acres

Appx. 11,000 parking spaces

Delivery Method

CMAR

Construction Value

$160 Million

Awards

Envision Platinum Verification

The Park Economy 3 (PE3) expansion at Raleigh-Durham International Airport (RDU) is a transformative project designed to redefine customer convenience and operational efficiency, while championing resilience and sustainability. By nearly tripling the parking capacity, this 100-acre project helps the airport meet its growing parking demands and serves as a critical enabler for other Vision 2040 projects.  

At the core of this effort is the integration of innovative solutions designed to enhance the traveler experience. Expanded entry and exit facilities, covered walkways for passenger comfort, and a dual bus route system exemplify customer-focused design. A dynamic wayfinding system ensures ease of navigation, while the implementation of cutting-edge security systems and Wi-Fi connectivity elevates the overall experience.

Aerial view of a large construction project near Raleigh-Durham International Airport surrounded by dense greenery.
Aerial view of RDU Park Economy 3 under construction, surrounded by dense forest, with logos for Balfour Beatty and Metcon.

This project isn’t just groundbreaking in design and scale; it demonstrates a commitment to sustainability and environmental stewardship. Significant effort was made to avoid disturbing natural ecosystems, such as creeks, wetlands, and environmental buffers, while also enhancing stormwater management capabilities. Working closely with subject matter experts from North Carolina State University, the team developed advanced stormwater strategies, including submerged gravel wetlands, which minimize environmental impact and provide enhanced treatment of stormwater runoff. Based on public feedback and direction from RDU, the project also incorporated the airport’s first solar installation, integrated above the pedestrian-covered walkways. Additionally, 100 electric vehicle charging stations are planned to be added to the program and are currently in design.  

It is the first project in the airport’s history to achieve Envision Platinum verification from the Institute for Sustainable Infrastructure. This certification framework is used to document and improve sustainability efforts on civil infrastructure projects. Additionally, the Customer Amenity Building is designed to achieve LEED certification, reflecting a strong alignment with global sustainability standards.  

Beyond infrastructure, this program has influenced operational policy at RDU, including the development and first application of the Environmental Compliance Review policy. Through this policy, the airport has reinforced its commitment to transparency and community engagement. This policy is the first of its kind to be developed by an airport across the country.

Aerial view of RDU Park Economy 3 parking lot surrounded by dense forest near highways, with RS&H and Raleigh-Durham International Airport logos.

The scale and complexity of this initiative required RS&H to overcome significant design and implementation challenges. From managing large volumes of earthwork and developing creative bus routing solutions to expanding the airport’s wayfinding and digital infrastructure, the project demanded innovative thinking and collaborative approaches. Thanks to close coordination with local and state agencies and RDU’s forward-focused leadership, the PE3 expansion has established a new benchmark for smart, sustainable airport projects.  

With an estimated completion of 2026, this undertaking represents RS&H’s dedication to pushing boundaries and delivering an exceptional experience for travelers, while fostering a more sustainable future in aviation.

Explore Exciting Career Opportunities with Us!

Related Projects

Together, RS&H and DRBA are transforming regional aviation, creating a stronger foundation for economic growth and seamless travel experiences across Delaware and beyond.

Aviation
Avelo Airlines planes parked at an airport with a control tower.

HCAA collaborated with RS&H, a trusted partner for more than 20 years and the original designer of TPA’s iconic terminal in the 1960s. Together, we prepared a detailed Project Definition Document (PDD) to guide the expansion, ensuring the project aligns with HCAA’s bold aspirations for the airport’s future.

Aviation
Spacious airport terminal with escalators, ceiling fixtures, and vibrant pillar advertisements.

As the prime consultant and engineer of record, RS&H designed this critical extension, which adds approximately 2,300 feet of a new 75-foot-wide taxiway with 30-foot shoulders, resulting in dual parallel taxiways on the north airfield.

Aviation
Aerial view of airport runways with adjacent construction and industrial buildings.
RS&H logo in blue.
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.