Employee ownership is accessible to everyone at RS&H. Learn how we collectively succeed together.

EPA Updates Requirements for Well Completions, Storage Tanks & Natural Gas Processing Plants

September 10, 2014      

The EPA has recently released updates and clarifications to its 2012 New Source Performance Standards for the oil and natural gas industry. These updates do not change the emission reduction requirements, but clarify technical aspects of well completion requisites, storage tank emission standards, and further explain definitions within the ruling.

For well completion operations, operators must direct flowback to use special equipment (a separator) to separate gas and liquid hydrocarbons coming from the well in what is known as “green completion.”  Captured gas and hydrocarbons can be treated or sold, but are not allowed to be flared off. Wells that are exempt from green completion also must use a separator, but are still allowed to flare for the time being. All wells subject to green completion must be in compliance by January 2015. Once the well is continuously producing, condensate, produced water, and crude oil must be routed to storage tanks, and an estimation of the volatile organic compound (VOC) production off those tanks must be calculated. Emissions of VOCs off of the tanks must be controlled within 60 days of production start, and venting or flaring of gas is prohibited.

For storage tanks, VOC emissions captured as a result of permit requirements do not count toward determining whether a tank is subject to emission control requirements. Also, operators must now include in their annual reports the date a specific storage tank is either removed or returned to service.  Finally, the EPA is going to allow other mechanisms other than weighted thief hatches provided they ensure the hatch lids are properly sealed.

The agency also clarified its position on leak detection requirements for natural gas processing plants.  Equipment leak detection and repair requirements only apply to equipment at onshore natural gas processing plants. Also, connectors are now added to the list of exempt equipment for leak detection requirements for small gas processing plants and processing plants on the Alaskan North Slope.

Additional updates to the 2012 New Source Performance Standards can be found here.

RS&H supports the oil and gas industry through its innovative engineering and environmental solutions, but we also provide a broad array of regulatory support. We can research the nuance of changing regulation, inform you of the practical impacts to your business, and craft responses and petitions to submit on your company’s or industry’s behalf. RS&H’s staff is available to support your business by attending public meetings and hearings, as well as maintaining one-on-one relationships with regulators, which can give your company a competitive edge.

Stay in the Know

Sign up to receive RS&H and industry news, blogs, case studies, and more in our monthly newsletter.

Name
Accept GDPR Terms(Required)
This field is for validation purposes and should be left unchanged.

Related Insights

insight
Celebrating Earth Day: A Discussion with RS&H’s Resiliency & Sustainability Leaders
April 22, 2024By Linnea Brudenell, AIA, LEED AP BD+C, Alex Howard

Every Earth Day serves as a reminder to celebrate to celebrate the achievements of the environmental movement and raise awareness about environmental consciousness.

AerospaceCorporateAviationFederalScienceHealthcareTransportation
insight
[Webinar] Evidence-Based Design Virtual Roundtable
April 18, 2024By Jessica Whitlock, Jennifer Youssef, Victoria Villarreal

Listen to RS&H’s Jennifer Youssef, Jessica Whitlock, and Victoria Villareal as they have a discussion with AdventHealth’s Michael Compton – Acute Care Studio Leader, and Stephen Szutenbach – Project Manager about EBD.

Healthcare

In this episode of AEC Perspectives RS&H Vice President, Richard Stump, joins host Bryan Nicol for an insightful conversation about working in the federal sphere. 

Federal

To commemorate Women's History Month, RS&H sat down with Senior Vice President and East Regional Leader for Infrastructure Janie Tiedeman, PE. Tiedeman is not only the chair for RS&H’s inaugural DE&I Steering Committee, but also serves as chair for RS&H’s women’s professional network, Ignite.