Berkmar Drive Extension
RS&H provided Independent Assurance and Independent Verification (IA/IV) services as Owner Representative to VDOT for the US Route 29 Solutions Design-Build project. The US Route 29 Solutions program was made up of three individual design-build projects. Berkmar Extension is a new 2.3-mile extension of Berkmar Drive consisting of two 12’ travel lanes, a 716’ bridge over the South Fork of the Rivanna River, a 5’ sidewalk, roundabouts, a 10’ shared use path, and landscaping.
Project Details
Description | Transportation Highways & Roads Bridges Construction Management Construction Engineering & Inspection CEI – Conventional & Complex Bridges CEI – Highways & Local Roads CEI – Pedestrian & Aesthetic Enhancements CPM Schedule Review |
Location | Charlottesville, VA |
Client | Virginia Department of Transportation Culpeper District |
Owner | Virginia Department of Transportation Culpeper District |
Awards | 2017 Infrastructure Project of the Year <$150M by the Construction Management Association of America – National Capital Chapter. |
Delivery Method | Design-Build |
Construction Value | $33.5M |