U.S. Route 460 Connector Phase I

RS&H provided Independent Assurance/Independent Verification services to VDOT as the prime consultant for this award winning project. The Route 460 Connector Phase I project includes new twin segmental bridges, known as the Grassy Creek Bridges; each 1,733’ long with a deck width of 43’, a maximum height of over 250’, and a longest span of 489’. The new bridges were constructed using the cast-in-place balanced cantilever method. Additional work included the construction of 0.8 miles of four-lane divided highway, an access ramp to Route 80, secondary connections to Route 609 and Route 690 from Route 80, and the construction of the Hunts Creek Bridge. RS&H also provided the inventory inspection of the new structures on behalf of VDOT.

Project Details

Description Transportation
Highways & Roads
Bridges
Construction Management
Construction Engineering & Inspection
CEI – Conventional & Complex Bridges
CEI – Highways & Local Roads
Claims Analysis
CPM Schedule Review
Procurement & Specification Authoring
In-Service Bridge Inspection
Location Breaks, VA
Client Virginia Department of Transportation Bristol District
Owner Virginia Department of Transportation Bristol District
Awards #1 in Roads and Bridges Magazine’s National Top 10 Bridges of 2013
2017 ASBI Bridge Award of Excellence
Delivery Method Design-Bid-Build
Construction Value $105M