Route 29 Solutions

RS&H provided Independent Assurance and Independent Verification (IA/IV) services as Owner Representative to VDOT for the US Route 29 Solutions Design-Build project. The US Route 29 Solutions program was made up of three individual design-build projects. The Route 29 Widening project included widening from four to six lanes by adding an additional lane on both sides of the highway for 1.8 miles. A 2.3 mile extension of Berkmar Drive, the Berkmar Drive Extension, included two 12′ travel lanes and a 716′ bridge over the South Fork of the Rivanna River. The Route 29 and Rio Road Grade-Separated Intersection project included a pre-cast box beam bridge, soldier pile retaining walls, pedestrian lighting, joint use duct bank construction, and traffic signal upgrades.

Project Details

Description Transportation
Highways & Roads
Bridges
Bike & Pedestrian Facilities
Construction Management
Construction Engineering & Inspection
CEI – Conventional & Complex Bridges
CEI – Highways & Local Roads
CEI – Pedestrian & Aesthetic Enhancements
CPM Schedule Review
Design-Build
Location Charlottesville, VA
Client Virginia Department of Transportation Culpeper District
Owner Virginia Department of Transportation Culpeper District
Awards 2017 Infrastructure Project of the Year <$150M by the Construction Management Association of America – National Capital Chapter.
Delivery Method Design-Bid-Build
Construction Value $116.7M

Questions?

If you have questions about this project or service, reach out to our team of experts.

Contact Us