Route 29 and Rio Road Grade-Separated Intersection

2019-04-17T09:36:27-04:00

Route 29 and Rio Road Grade-Separated Intersection RS&H provided Independent Assurance and Independent Verification (IA/IV) services as Owner Representative to VDOT for the US Route 29 Solutions Design-Build project. The US Route 29 Solutions program was made up of three individual design-build projects. The Route 29 and Rio Road Grade-Separated Intersection [...]

Lesner Bridge Replacement

2019-04-22T14:36:25-04:00

Lesner Bridge Replacement RS&H provided CEI services on the Lesner Bridge Replacement for the City of Virginia Beach. Construction included twin 1,575-foot pre-cast, post-tensioned, segmental bridges providing a 45-foot clearance over the Lynnhaven Inlet via Shore Drive. Each structure consists of ten spans; nine at 150 feet and a channel span [...]

US 183 South

2019-04-17T12:36:49-04:00

US 183 South RS&H is currently performing inspection services as prime for construction of the US 183 South Design-Build Project in Austin, Texas. Stretching from US 290 to SH 71, the new expressway will improve mobility and safety along this heavily-traveled corridor, which is one of the primary routes to the Austin-Bergstrom [...]

Pearl Parkway Multiway Boulevard and Multi-Use Path

2019-06-17T12:46:05-04:00

Pearl Parkway Multiway Boulevard and Multi-Use Path RS&H completed the design of two projects along Pearl Parkway, a major urban arterial that is a vital transportation corridor. Both sides of the roadway were designed as a multi-way boulevard, also known as a woonerf (or living street), which combines automobiles, bikes, and pedestrians [...]

North Meadows Extension

2019-06-17T12:47:41-04:00

North Meadows Extension RS&H served as the prime consultant for the North Meadows extension, a new roadway connection from The Meadows to US 85 and I-25. The project included approximately 2 miles of virgin four-lane arterial roadway; two new interchanges with five bridges at BNSF and UP railroads, Plum Creek, US 85, and [...]

SH 82/Grand Avenue Bridge Replacement

2019-06-17T12:48:37-04:00

SH 82/Grand Avenue Bridge Replacement RS&H was part of the consultant team that developed and analyzed alternatives for the Grand Avenue Bridge replacement. RS&H provided project management, bridge and structural design, roadway alternatives, hydrology, traffic, environmental assessment, and post-design services. Significant public involvement was used to gain public support for the [...]

Florida Hospital Automated Clinical Testing Laboratories

2019-02-07T08:26:41-04:00

Florida Hospital Automated Clinical Testing Laboratories In order to serve patients with a quick turnaround on medical tests, Florida Hospital asked RS&H to assist them in developing a plan to increase the volume of samples processed through automation. The key was to allow current continual service to patient needs, while phasing remodeled spaces with [...]

Orlando Health Arnold Palmer Pediatrics

2019-02-07T08:26:11-04:00

Orlando Health Arnold Palmer Pediatrics This 2,262-square-foot pediatric rehabilitation suite was renovated and expanded from an existing space that was small and compartmentalized. The rehabilitation suite was designed for children with physical disabilities and included specialty equipment to assist with their road to recovery. Not only is the space full of fun and creative [...]

Orlando Health Outpatient Surgery Center

2019-02-07T08:25:45-04:00

Orlando Health Outpatient Surgery Center The project is a ground-up Outpatient Surgery Center (OSC) in Clermont, Florida. The single story 28,000-square-foot building is located on a large parcel immediately behind the hospital. To our knowledge, this is the first OSC project in the state of Florida reviewed by AHCA that will house a [...]