Manor Expressway Phase II2018-12-07T17:05:15+00:00

Project Description

Project Details

Description Transportation
Tolls and Managed Lanes
Construction Management
Construction Engineering and Inspection
Turnpike & Toll Roads
Location Travis County, TX
Client/Owner Central Texas Regional Mobility Authority

Contact

Douglas D. Geiger, PE
Transportation Construction Management
407-893-5873
Doug.Geiger@rsandh.com

Michael J. Davis, PE, DBIA
Tolls & Managed Lanes
407-893-5835
Michael.DavisJ@rsandh.com

Manor Expressway Phase II

RS&H performed CEI services on Phase II of the Manor Expressway Project. This was a Public-Private-Partnership (P3) project which included completion of the Manor Expressway Project from Phase I at the US 183 interchange to the eastern limits east of SH 130. Three tolled mainlanes and three lane non-tolled frontage roads were constructed in each direction as well as all associated ramps, auxiliary lanes, toll gantries, and ramp gantries. The project also provided grade-separated intersections at Tuscany Way and Springdale Road so that users of the direct connectors constructed as part of Phase I can bypass the existing signals at those intersections. These two grade-separated intersections provide for a minimum of two tolled lanes of travel and two-lane non-tolled frontage roads in each direction.