I-20 Wateree Bridge Design-Build Prep, SCDOT
RS&H is assisting SCDOT in developing a design-build RFP for replacement or rehabilitation of up to 10 bridge structures at the I-20 crossing of the Wateree River.
Due to the high potential cost of full replacement, the RS&H team will be developing a Life Cycle Cost Analysis to determine the most cost-effective solution for the project.
Project Details
Description | Transportation Highways & Roads Bridges Traffic & Transportation Operations Engineering Civil Engineering Structural Engineering |
Location | Camden, SC |
Client/Owner | SCDOT |
Delivery Method | Design-Build RFP Package |