I-20 Wateree Bridge Design-Build Prep, SCDOT

RS&H is assisting SCDOT in developing a design-build RFP for replacement or rehabilitation of up to 10 bridge structures at the I-20 crossing of the Wateree River.

Due to the high potential cost of full replacement, the RS&H team will be developing a Life Cycle Cost Analysis to determine the most cost-effective solution for the project.

Project Details

Description Transportation
Highways & Roads
Bridges
Traffic & Transportation Operations
Engineering
Civil Engineering
Structural Engineering
Location Camden, SC
Client/Owner SCDOT
Delivery Method Design-Build RFP Package