I-95 Widening Stormwater Management

2018-09-26T20:10:43+00:00

I-95 Widening Stormwater Management and Spruce Creek Hydrodynamic Model Stormwater Management and Drainage Design RS&H is providing design services to widen I-95 from SR 44 to I-4 by adding fifth and sixth lanes within the existing median. The existing pavement will be milled and resurfaced, and the interchange at SR 421 will be reconstructed. [...]

SR 408/SR 417 Interchange Improvements

2018-09-06T00:39:49+00:00

SR 408/SR 417 Interchange Improvements The SR 408/SR 417 interchange is one of the largest and most heavily traveled interchanges linking northeast Orlando and downtown. The interchange suffered severe congestion during peak travel times and was confusing to motorists. To address these issues and improve regional mobility, the Orlando-Orange County Expressway Authority (OOCEA) [...]

Arrowhead Golf Course Shared-Use Drainage

2018-09-06T03:22:55+00:00

Arrowhead Golf Course Shared-Use Drainage As the Owner’s Representative for the I-595 Corridor Improvements, RS&H developed final design plans to reconstruct Arrowhead Golf Course in the Town of Davie, Florida, to accommodate drainage from the corridor. The project expands the wet detention pond areas and upgrades the internal golf course drainage system [...]