Route 28 (Centreville Road) Widening

2019-05-14T12:47:28-04:00

Route 28 (Centreville Road) Widening RS&H was selected to provide pre-award and post-award engineering support and construction phase independent assurance/independent verification sampling and testing for this estimated $60M design-build project. The construction scope of work includes widening of Route 28 from four to six lanes from the Prince William County/Fairfax County [...]

I-70 Mountain Express Lanes (EB Peak Period Shoulder Lanes)

2019-05-13T14:41:28-04:00

I-70 Mountain Express Lanes (EB Peak Period Shoulder Lanes) RS&H provided construction administration and observation for this $72 million Construction Manager/General Contractor (CM/GC) project for CDOT Region 1 located along I-70 from Empire Junction to east of Idaho Springs. The I-70 Mountain Express Lane project created a shoulder along the existing [...]

Bay Region Bridge Scoping and In-Service Inspections

2019-05-13T11:36:11-04:00

Bay Region Bridge Scoping and In-Service Inspections RS&H was selected by the MDOT Bay Region to perform bridge scoping and repair recommendations, routine bridge safety inspection, and in-depth bridge safety inspection for 21 structures located along I-69 in Genesee County. Structure types include prestressed concrete I-beam, steel beam with pin and [...]

I-70G Edwards Interchange

2019-05-13T11:05:48-04:00

I-70G Edwards Interchange RS&H is providing construction services on the I-70G Edwards Interchange Upgrade Phase II project in Edwards, Colorado. The Edwards Interchange project includes reconstruction of the intersection of I-70G and US 6 and will convert it from a signalized intersection to a 2-lane roundabout. Widening of the spur road to [...]

I-70 Wolcott East Overlay

2019-05-08T15:09:53-04:00

I-70 Wolcott East Overlay As the prime consultant, RS&H performed construction management, construction observation, documentation, and prepared contractor payments for this $11 million project in Eagle County, Colorado. Over the course of a year, the RS&H team improved the driving surface and safety features on I-70 with the placement of 35,000 tons [...]

I-70 Twin Tunnels (Veterans Memorial Tunnels)

2019-05-08T14:14:52-04:00

I-70 Twin Tunnels (Veterans Memorial Tunnels) RS&H provided construction administration services on the $106 I-70 Twin Tunnels project for CDOT that added one eastbound lane from the East Idaho Springs interchange to US 6. RS&H was responsible for the inspection of wall, tunnel, and roadway elements as well as documentation and training. [...]

Witchduck Road Phase II

2019-05-08T13:24:57-04:00

Witchduck Road Phase II RS&H is providing construction engineer and inspection services to the City of Virginia Beach for the Witchduck Road Phase II LAP. This roadway widening project constructs a six-lane divided roadway on a 143-foot to 165-foot variable right-of-way from I-264 to Virginia Beach Boulevard, a distance of approximately 2,600’. [...]

U.S. Route 460 Connector Phase I

2019-05-03T11:17:49-04:00

U.S. Route 460 Connector Phase I R&SH provided Independent Assurance/Independent Verification services to VDOT as the prime consultant for this award winning project. The Route 460 Connector Phase I project includes new twin segmental bridges, known as the Grassy Creek Bridges; each 1,733’ long with a deck width of 43’, a maximum [...]

Route 29 Widening

2019-05-03T09:49:42-04:00

Route 29 Widening RS&H provided Independent Assurance and Independent Verification (IA/IV) services as Owner Representative to VDOT for the US Route 29 Solutions Design-Build project. The US Route 29 Solutions program was made up of three individual design-build projects. The Route 29 Widening project expanded Route 29 from four to six lanes [...]

Route 29 Solutions

2019-05-02T15:03:33-04:00

Route 29 Solutions RS&H provided Independent Assurance and Independent Verification (IA/IV) services as Owner Representative to VDOT for the US Route 29 Solutions Design-Build project. The US Route 29 Solutions program was made up of three individual design-build projects. The Route 29 Widening project included widening from four to six lanes [...]