VDOT Fredericksburg District Megaprojects Program Support Services (FRED EX) RS&H is serving as Owner’s Representative during procurement, phased design, and construction of the $565M I-95 Fredericksburg Extension (FredEx) P3 Design-Build Project. The goal of the FredEx Project is to reduce congestion on I-95 in the vicinity of the Route 610 and Route 17 [...]
VDOT State Wide Maintenance Consultant and Augmentation Services
Kim Anderson-Thomson2022-11-04T07:27:31-04:00VDOT State Wide Maintenance Consultant and Augmentation Services RS&H has supported the Virginia Department of Transportation under the State Wide Maintenance Consultant and Augmentation Services contract through a variety of task work orders. Work has been performed under this contract in multiple Districts and has included inspection of design-build construction, field and [...]
US 36 Boulder Bridges Flood Recovery
Kim Anderson-Thomson2022-11-04T07:21:23-04:00US 36 Boulder Bridges Flood Recovery RS&H provided construction management services for CDOT on this $7.6 million flood recovery project after heavy rain and flooding caused massive damage to the roadway and channel banks along the St. Vrain and Left Hand Creek drainages. The project replaced a 60+ year old concrete box [...]
Route 28 (Centreville Road) Widening
Kim Anderson-Thomson2022-11-03T22:24:48-04:00Route 28 (Centreville Road) Widening RS&H was selected to provide pre-award and post-award engineering support and construction phase independent assurance/independent verification sampling and testing for this estimated $60M design-build project. The construction scope of work includes widening of Route 28 from four to six lanes from the Prince William County/Fairfax County line [...]
I-70 Westbound Peak Period Shoulder Lane (PPSL)
Kim Anderson-Thomson2022-11-03T21:22:06-04:00I-70 Westbound Peak Period Shoulder Lane (PPSL) The general-purpose lanes and shoulder of westbound I-70 from Empire Junction to east of Idaho Springs are being reconstructed and widened in select locations on the existing alignment to accommodate a lane on the shoulder for use during peak travel periods. Drainage enhancements include a [...]
I-70 Mountain Express Lanes (EB Peak Period Shoulder Lanes)
Kim Anderson-Thomson2022-11-03T21:21:59-04:00I-70 Mountain Express Lanes (EB Peak Period Shoulder Lanes) RS&H provided construction administration and observation for this $72 million Construction Manager/General Contractor (CM/GC) project for CDOT Region 1 located along I-70 from Empire Junction to east of Idaho Springs. The I-70 Mountain Express Lane project created a shoulder along the existing roadway [...]
I-70 Wolcott East Overlay
Kim Anderson-Thomson2022-11-03T21:22:26-04:00I-70 Wolcott East Overlay As the prime consultant, RS&H performed construction management, construction observation, documentation, and prepared contractor payments for this $11 million project in Eagle County, Colorado. Over the course of a year, the RS&H team improved the driving surface and safety features on I-70 with the placement of 35,000 tons [...]
Witchduck Road Phase II
Kim Anderson-Thomson2022-11-04T07:45:03-04:00Witchduck Road Phase II RS&H is providing construction engineer and inspection services to the City of Virginia Beach for the Witchduck Road Phase II LAP. This roadway widening project constructs a six-lane divided roadway on a 143-foot to 165-foot variable right-of-way from I-264 to Virginia Beach Boulevard, a distance of approximately 2,600’. [...]
U.S. Route 460 Connector Phase I
Kim Anderson-Thomson2022-11-04T07:06:17-04:00U.S. Route 460 Connector Phase I RS&H provided Independent Assurance/Independent Verification services to VDOT as the prime consultant for this award winning project. The Route 460 Connector Phase I project includes new twin segmental bridges, known as the Grassy Creek Bridges; each 1,733’ long with a deck width of 43’, a maximum [...]
Route 29 Widening
Kim Anderson-Thomson2022-11-03T22:25:59-04:00Route 29 Widening RS&H provided Independent Assurance and Independent Verification (IA/IV) services as Owner Representative to VDOT for the US Route 29 Solutions Design-Build project. The US Route 29 Solutions program was made up of three individual design-build projects. The Route 29 Widening project expanded Route 29 from four to six lanes by [...]