VDOT Fredericksburg District Megaprojects Program Support Services (FRED EX)

2022-11-03T15:25:21-04:00

VDOT Fredericksburg District Megaprojects Program Support Services (FRED EX) RS&H is serving as Owner’s Representative during procurement, phased design, and construction of the $565M I-95 Fredericksburg Extension (FredEx) P3 Design-Build Project.   The goal of the FredEx Project is to reduce congestion on I-95 in the vicinity of the Route 610 and Route 17 [...]

Flame Trench and Deflector System at Launch Complex 39B

2022-11-03T20:51:39-04:00

Flame Trench and Deflector System at Launch Complex 39B RS&H was honored by the National Aeronautics and Space Administration (NASA) in 2020 with a Silver Achievement Medal for the combined teams’ success in modifying and constructing the flame trench and deflector system at Launch Complex 39B (LC39B). This joint effort between [...]

SR 5/N. Roosevelt Blvd High-Intensity Activated Cross Walks

2022-11-03T22:40:37-04:00

SR 5/N. Roosevelt Blvd High-Intensity Activated Cross Walks RS&H provided construction engineering and inspection services for this highly anticipated safety project in the Florida Keys. The project included modifying five existing mid-block pedestrian crosswalks along SR 5/North Roosevelt Boulevard between the Triangle and 2nd Street in Key West, replacing them with HAWKs (High Intensity [...]

Colorado Springs Airport

2022-11-03T20:25:44-04:00

Colorado Springs Airport RS&H was selected by the City of Colorado Springs to provide design and construction phase services for the Airfield Lighting Control and Monitoring System in 2008, then selected to provide on-call engineering services in 2009, 2014, and again in 2018, which included design, bid and construction phase services. Projects included runway [...]

Repair Airfield Parking Apron at Hangar 750, Patrick Space Force Base, FL

2022-11-03T22:21:54-04:00

Description Defense Hangars & Airfields Construction Engineering & Inspection Civil Engineering Location Patrick Space Force Base, FL Client 40,000 SF Size 61, 800 SY of Pavement Delivery Method Design-Bid-Build Construction Value $13M Repair Airfield Parking Apron at Hangar 750, Patrick Space Force Base, FL [...]

I-75 Modernization Segment II

2022-11-03T21:24:19-04:00

Description Transportation Highways & Roads Bridges Construction Management Construction Engineering & Inspection CEI - Conventional & Complex Bridges CEI - Highways & Local Roads Design-Build Location Oakland County, MI Owner Michigan Department of Transportation – Oakland TSC Client Michigan Department of Transportation – Oakland TSC Delivery Method Design-Build Construction Value $224M [...]

VDOT State Wide Maintenance Consultant and Augmentation Services

2022-11-04T07:27:31-04:00

VDOT State Wide Maintenance Consultant and Augmentation Services RS&H has supported the Virginia Department of Transportation under the State Wide Maintenance Consultant and Augmentation Services contract through a variety of task work orders. Work has been performed under this contract in multiple Districts and has included inspection of design-build construction, field and [...]

US 36 Boulder Bridges Flood Recovery

2022-11-04T07:21:23-04:00

US 36 Boulder Bridges Flood Recovery RS&H provided construction management services for CDOT on this $7.6 million flood recovery project after heavy rain and flooding caused massive damage to the roadway and channel banks along the St. Vrain and Left Hand Creek drainages. The project replaced a 60+ year old concrete box [...]

Route 28 (Centreville Road) Widening

2022-11-03T22:24:48-04:00

Route 28 (Centreville Road) Widening RS&H was selected to provide pre-award and post-award engineering support and construction phase independent assurance/independent verification sampling and testing for this estimated $60M design-build project. The construction scope of work includes widening of Route 28 from four to six lanes from the Prince William County/Fairfax County line [...]

I-70 Westbound Peak Period Shoulder Lane (PPSL)

2022-11-03T21:22:06-04:00

I-70 Westbound Peak Period Shoulder Lane (PPSL) The general-purpose lanes and shoulder of westbound I-70 from Empire Junction to east of Idaho Springs are being reconstructed and widened in select locations on the existing alignment to accommodate a lane on the shoulder for use during peak travel periods. Drainage enhancements include a [...]