I-70 Westbound Peak Period Shoulder Lane (PPSL)

2019-05-14T10:48:10-04:00

I-70 Westbound Peak Period Shoulder Lane (PPSL) The general-purpose lanes and shoulder of westbound I-70 from Empire Junction to east of Idaho Springs are being reconstructed and widened in select locations on the existing alignment to accommodate a lane on the shoulder for use during peak travel periods. Drainage enhancements include [...]

I-70 Mountain Express Lanes (EB Peak Period Shoulder Lanes)

2019-05-13T14:41:28-04:00

I-70 Mountain Express Lanes (EB Peak Period Shoulder Lanes) RS&H provided construction administration and observation for this $72 million Construction Manager/General Contractor (CM/GC) project for CDOT Region 1 located along I-70 from Empire Junction to east of Idaho Springs. The I-70 Mountain Express Lane project created a shoulder along the existing [...]

U.S. Route 460 Connector Phase I

2019-05-03T11:17:49-04:00

U.S. Route 460 Connector Phase I R&SH provided Independent Assurance/Independent Verification services to VDOT as the prime consultant for this award winning project. The Route 460 Connector Phase I project includes new twin segmental bridges, known as the Grassy Creek Bridges; each 1,733’ long with a deck width of 43’, a maximum [...]

VDOT District Wide CEI Services

2019-04-29T15:42:44-04:00

Project Details Description Construction Management Construction Engineering & Inspection CEI - Conventional & complex Bridges CEI - Highways & Local Roads CEI - Pedestrian & Aesthetic Enhancements Claims Analysis CPM Schedule Review Design-Build Owners Location VDOT Culpeper, Bristol, Northern Virginia, and Hampton Roads Districts, VA Client Virginia Department of Transportation Owner [...]

I-96 and I-196 Interchange

2019-04-16T14:34:29-04:00

I-96 and I-196 Interchange RS&H provided as-needed construction inspection to the Grand Rapids TSC for the initial reconstruction of the I-96 and I-196 Interchange in Grand Rapids. The project includes replacing the westbound I-196 over eastbound I-96 bridge by constructing a new bridge carrying eastbound I-96 over westbound I-196. A new [...]

Lesner Bridge Replacement

2019-04-22T14:36:25-04:00

Lesner Bridge Replacement RS&H provided CEI services on the Lesner Bridge Replacement for the City of Virginia Beach. Construction included twin 1,575-foot pre-cast, post-tensioned, segmental bridges providing a 45-foot clearance over the Lynnhaven Inlet via Shore Drive. Each structure consists of ten spans; nine at 150 feet and a channel span [...]