Wekiva Parkway Section 6 Design-Build

2019-04-17T14:45:23-04:00

Wekiva Parkway Section 6 Design-Build RS&H is providing construction engineering and inspection services on the Wekiva Parkway Section 6 Design-Build project for FDOT District Five with project limits from west of SR 429 to just west of Longwood-Markham Road. The project includes six miles of limited access toll road which will be [...]

U.S Route 121 and US Route 460 Connector Phase II

2019-04-17T12:18:48-04:00

U.S Route 121 and US Route 460 Connector Phase II U.S Route 121 and U.S Route 460 Connector Phase II entails the new construction of approximately 56.25 miles of four-lane limited access highway in southwestern Virginia. These design-build and public-private-partnership projects involve the preliminary engineering, design, and construction of two high-priority corridors [...]

I-96 and I-196 Interchange

2019-04-16T14:34:29-04:00

I-96 and I-196 Interchange RS&H provided as-needed construction inspection to the Grand Rapids TSC for the initial reconstruction of the I-96 and I-196 Interchange in Grand Rapids. The project includes replacing the westbound I-196 over eastbound I-96 bridge by constructing a new bridge carrying eastbound I-96 over westbound I-196. A new [...]

I-25/Cimarron Street (US 24) Interchange Design-Build

2019-04-16T18:26:31-04:00

I-25/Cimarron Street (US 24) Interchange Design-Build RS&H served as engineering design lead to Kraemer North America for the I-25/Cimarron (US 24) Interchange, the second largest highway construction project in the Pikes Peak region. The complicated reconstruction, which consisted of converting the interchange to a Single Point Urban Interchange (SPUI), included realignment of [...]

C-470/Santa Fe Flyover Design-Build

2019-04-17T22:12:47-04:00

C-470/Santa Fe Flyover Design-Build RS&H teamed with Kraemer to provide a new connection between southbound Santa Fe Drive (US 85) and eastbound C-470 in Littleton, Colorado. The flyover bridge spans Santa Fe Drive, C-470, Wolhurst Street, a UPRR bridge, and a BNSF bridge and reaches a maximum height of nearly 70 feet. [...]

Route 29 and Rio Road Grade-Separated Intersection

2019-04-17T09:36:27-04:00

Route 29 and Rio Road Grade-Separated Intersection RS&H provided Independent Assurance and Independent Verification (IA/IV) services as Owner Representative to VDOT for the US Route 29 Solutions Design-Build project. The US Route 29 Solutions program was made up of three individual design-build projects. The Route 29 and Rio Road Grade-Separated Intersection [...]

Lesner Bridge Replacement

2019-04-16T19:05:35-04:00

Lesner Bridge Replacement RS&H provided CEI services on the Lesner Bridge Replacement for the City of Virginia Beach. Construction included twin 1,575’ pre-cast, post-tensioned, segmental bridges providing a 45’ clearance over the Lynnhaven Inlet via Shore Drive. Each structure consists of ten spans; nine at 150’ and a channel span of 225’. [...]

North Meadows Extension

2019-03-20T09:15:34-04:00

North Meadows Extension RS&H served as the prime consultant for the North Meadows extension, a new roadway connection from The Meadows to US 85 and I-25. The project included approximately 2 miles of virgin four-lane arterial roadway; two new interchanges with five bridges at BNSF and UP railroads, Plum Creek, US 85, and [...]

SH 82/Grand Avenue Bridge Replacement

2019-03-20T09:16:02-04:00

SH 82/Grand Avenue Bridge Replacement RS&H was part of the consultant team that developed and analyzed alternatives for the Grand Avenue Bridge replacement. RS&H provided project management, bridge and structural design, roadway alternatives, hydrology, traffic, environmental assessment, and post-design services. Significant public involvement was used to gain public support for the [...]

Veterans Memorial Bridge

2019-04-17T12:56:58-04:00

Veterans Memorial Bridge The Veterans Memorial Bridge, funded by the American Recovery and Reinvestment Act, is one of the largest design-build projects the Florida Department of Transportation awarded in 2009. This 3,100-foot, high-level Category 2 bridge structure built within a highly sensitive environmental corridor will provide an important segment in the new connection [...]