SW 10th Street Connector PD&E Study

2023-08-03T12:14:02-04:00

SW 10th Street Connector PD&E Study There have been various planning studies beginning in the early 1970’s to extend limited access roadways from the Sawgrass Expressway and Florida’s Turnpike to I-95 along the SW 10th Street corridor. The Sawgrass Expressway opened in 1988 but fell three miles short of I-95, forcing vehicles destined [...]

VDOT State Wide Maintenance Consultant and Augmentation Services

2022-11-04T07:27:31-04:00

VDOT State Wide Maintenance Consultant and Augmentation Services RS&H has supported the Virginia Department of Transportation under the State Wide Maintenance Consultant and Augmentation Services contract through a variety of task work orders. Work has been performed under this contract in multiple Districts and has included inspection of design-build construction, field and [...]

I-70G Edwards Interchange

2022-11-03T21:22:39-04:00

I-70G Edwards Interchange RS&H is providing construction services on the I-70G Edwards Interchange Upgrade Phase II project in Edwards, Colorado. The Edwards Interchange project includes reconstruction of the intersection of I-70G and US 6 and will convert it from a signalized intersection to a 2-lane roundabout. Widening of the spur road to [...]

Witchduck Road Phase II

2022-11-04T07:45:03-04:00

Witchduck Road Phase II RS&H is providing construction engineer and inspection services to the City of Virginia Beach for the Witchduck Road Phase II LAP. This roadway widening project constructs a six-lane divided roadway on a 143-foot to 165-foot variable right-of-way from I-264 to Virginia Beach Boulevard, a distance of approximately 2,600’. [...]

Route 29 Widening

2022-11-03T22:25:59-04:00

Route 29 Widening RS&H provided Independent Assurance and Independent Verification (IA/IV) services as Owner Representative to VDOT for the US Route 29 Solutions Design-Build project. The US Route 29 Solutions program was made up of three individual design-build projects. The Route 29 Widening project expanded Route 29 from four to six lanes by [...]

Route 29 Solutions

2022-11-03T22:25:47-04:00

Route 29 Solutions RS&H provided Independent Assurance and Independent Verification (IA/IV) services as Owner Representative to VDOT for the US Route 29 Solutions Design-Build project. The US Route 29 Solutions program was made up of three individual design-build projects. The Route 29 Widening project included widening from four to six lanes by [...]

Berkmar Drive Extension

2022-11-03T19:56:52-04:00

Berkmar Drive Extension RS&H provided Independent Assurance and Independent Verification (IA/IV) services as Owner Representative to VDOT for the US Route 29 Solutions Design-Build project. The US Route 29 Solutions program was made up of three individual design-build projects. Berkmar Extension is a new 2.3-mile extension of Berkmar Drive consisting of two 12’ [...]

Wekiva Parkway Section 6 Design-Build

2023-07-17T10:17:35-04:00

Wekiva Parkway Section 6 Design-Build RS&H is providing construction engineering and inspection services on the Wekiva Parkway Section 6 Design-Build project for FDOT District Five with project limits from west of SR 429 to just west of Longwood-Markham Road. The project includes six miles of limited access toll road which will be [...]

I-25/Cimarron Street (US 24) Interchange Design-Build

2022-11-03T21:16:12-04:00

I-25/Cimarron Street (US 24) Interchange Design-Build RS&H served as engineering design lead to Kraemer North America for the I-25/Cimarron (US 24) Interchange, the second largest highway construction project in the Pikes Peak region. The complicated reconstruction, which consisted of converting the interchange to a Single Point Urban Interchange (SPUI), included realignment of [...]

Go to Top