I-70G Edwards Interchange

2019-05-13T11:05:48-04:00

I-70G Edwards Interchange RS&H is providing construction services on the I-70G Edwards Interchange Upgrade Phase II project in Edwards, Colorado. The Edwards Interchange project includes reconstruction of the intersection of I-70G and US 6 and will convert it from a signalized intersection to a 2-lane roundabout. Widening of the spur road to [...]

Witchduck Road Phase II

2019-05-08T13:24:57-04:00

Witchduck Road Phase II RS&H is providing construction engineer and inspection services to the City of Virginia Beach for the Witchduck Road Phase II LAP. This roadway widening project constructs a six-lane divided roadway on a 143-foot to 165-foot variable right-of-way from I-264 to Virginia Beach Boulevard, a distance of approximately 2,600’. [...]

Route 29 Widening

2019-05-03T09:49:42-04:00

Route 29 Widening RS&H provided Independent Assurance and Independent Verification (IA/IV) services as Owner Representative to VDOT for the US Route 29 Solutions Design-Build project. The US Route 29 Solutions program was made up of three individual design-build projects. The Route 29 Widening project expanded Route 29 from four to six lanes [...]

Route 29 Solutions

2019-05-02T15:03:33-04:00

Route 29 Solutions RS&H provided Independent Assurance and Independent Verification (IA/IV) services as Owner Representative to VDOT for the US Route 29 Solutions Design-Build project. The US Route 29 Solutions program was made up of three individual design-build projects. The Route 29 Widening project included widening from four to six lanes [...]

Berkmar Drive Extension

2019-04-29T15:06:07-04:00

Berkmar Drive Extension RS&H provided Independent Assurance and Independent Verification (IA/IV) services as Owner Representative to VDOT for the US Route 29 Solutions Design-Build project. The US Route 29 Solutions program was made up of three individual design-build projects. Berkmar Extension is a new 2.3-mile extension of Berkmar Drive consisting of two 12’ [...]

Wekiva Parkway Section 6 Design-Build

2019-04-24T12:07:15-04:00

Wekiva Parkway Section 6 Design-Build RS&H is providing construction engineering and inspection services on the Wekiva Parkway Section 6 Design-Build project for FDOT District Five with project limits from west of SR 429 to just west of Longwood-Markham Road. The project includes six miles of limited access toll road which will be [...]

I-25/Cimarron Street (US 24) Interchange Design-Build

2019-04-16T18:26:31-04:00

I-25/Cimarron Street (US 24) Interchange Design-Build RS&H served as engineering design lead to Kraemer North America for the I-25/Cimarron (US 24) Interchange, the second largest highway construction project in the Pikes Peak region. The complicated reconstruction, which consisted of converting the interchange to a Single Point Urban Interchange (SPUI), included realignment of [...]

Pearl Parkway Multiway Boulevard and Multi-Use Path

2019-03-20T09:15:07-04:00

Pearl Parkway Multiway Boulevard and Multi-Use Path RS&H completed the design of two projects along Pearl Parkway, a major urban arterial that is a vital transportation corridor. Both sides of the roadway were designed as a multi-way boulevard, also known as a woonerf (or living street), which combines automobiles, bikes, and pedestrians [...]

North Meadows Extension

2019-03-20T09:15:34-04:00

North Meadows Extension RS&H served as the prime consultant for the North Meadows extension, a new roadway connection from The Meadows to US 85 and I-25. The project included approximately 2 miles of virgin four-lane arterial roadway; two new interchanges with five bridges at BNSF and UP railroads, Plum Creek, US 85, and [...]

SH 82/Grand Avenue Bridge Replacement

2019-03-20T09:16:02-04:00

SH 82/Grand Avenue Bridge Replacement RS&H was part of the consultant team that developed and analyzed alternatives for the Grand Avenue Bridge replacement. RS&H provided project management, bridge and structural design, roadway alternatives, hydrology, traffic, environmental assessment, and post-design services. Significant public involvement was used to gain public support for the [...]