envelope icon.
Comments
transparent overlay.

Presentation Recording

Welcome to the Central Florida Expressway Authority’s virtual Pre-Construction Information Meeting for the State Road 538 widening project from Ronald Reagan Parkway to County Road 580/Cypress Parkway.

For best performance, please view this slideshow in either Chrome or Internet Explorer.

Click image to enlarge
Intro graphic stating that video will be added soon.
transparent overlay.
Headshots of CFX team.

CFX Board

CFX is an independent agency of the state, governed by a Board of seven locally elected leaders and three governor appointees.

transparent overlay.
Map of State Road 417.

About CFX

State Road 538, also known as Poinciana Parkway, is part of the 125-mile regional expressway system that is planned, designed, constructed, maintained and operated by CFX.

CFX operates E-PASS, the first electronic toll collection system in Florida, with more than 500,000 E-PASS accounts. The CFX limited access network that serves 3 million residents and more than 75 million visitors, is fully funded by toll revenue; no tax dollars are used for CFX’s $2.7 billion 5-Year Work Plan. 

transparent overlay.
Graphic with logo for State Road 417 and intro text.

Welcome

If you would like to ask a question or make a comment at any time, just click the envelope icon in the top right corner of your screen. You will be able to type in your question or comment.

Public comment is essential in this process. Please try to get your comments regarding the information in this virtual meeting into CFX by Friday, August 7, 2020.

transparent overlay.

Title VI Compliance

This virtual meeting is being conducted without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to Title VI compliance by the Central Florida Expressway Authority may do so by contacting Kevin Camara, public information officer, by mail, phone or email.

Kevin Camara
Public Information Officer
4974 ORL Tower Road
Orlando, FL 32807

Phone: 407-383-5817

Email: Construction@CFXway.com

All inquiries or complaints will be handled according to CFX procedure and in a prompt and courteous manner.

transparent overlay.
Click image to enlarge
Map of corridor widening project.

Corridor Widening Project

CFX is widening 7.2 miles of State Road 538 from Ronald Reagan Parkway to Cypress Parkway, adding two lanes for a total of four travel lanes -- two in each direction.

This is a crucial east-west connection, providing access to regional transportation networks, theme parks, and the metro Orlando area. The widening of State Road 538 will improve traffic flow for residents of Poinciana, one of Florida’s fastest-growing areas. This project includes three proposed sound walls as noted in the orange boxes on this map.

transparent overlay.
Click image to enlarge
Example of a sound wall.

Sound Wall Criteria

During design a noise study, following state and federal guidelines, is conducted to determine noise impacts associated with the expressway widening. The study identifies noise sensitive sites such as homes, schools, churches, and recreational areas along the project corridor. For this project, sound walls have been considered for areas predicted to experience noise levels that reach or exceed 66 decibels or experience an increase of 15 decibels over existing noise levels. Additionally, the sound wall must provide at least a 5-decibel reduction to be considered feasible.

Sixty-six decibels would be slightly louder than heavy traffic 300 feet away; fifteen decibels compares to the noise you would hear at night in a rural area. Think crickets. There is also consideration involving the cost-per-benefitted property.

transparent overlay.
Click image to enlarge
Line diagram of segement 1.

Sound Wall Survey Card

During the design process, property owners who are identified as benefitting from proposed sound walls, are asked to vote on whether they want the noise barriers. Ballots, like the one pictured here, have already been mailed to those people identified as benefitted property owners for this project.

transparent overlay.
Click image to enlarge
Cover of traffic noise study report.

Traffic Noise Analysis

We have posted the Noise Study Report on the SR 538 Widening project web page. Please review it for details or contact us with questions. Now let’s review the proposed sound wall locations for this widening segment.

transparent overlay.

Sound Wall Typical Section

This is a sound wall typical section. It shows the standard placement of the sound wall located at the outside shoulder of the expressway. Beyond the sound wall, you see the fence along the CFX right of way. Sometimes a sound wall is built close to the right of way line.

Click image to enlarge
Graphic showing proposed height and placement of sound wall.
transparent overlay.
Click image to enlarge
Map of corridor widening project.

Sound Wall (Line Map)

Design for the widening is scheduled to begin in late 2020. Construction is expected to begin next spring and is expected to be complete by fall 2023.

In addition to the widening, there are three proposed sound walls along this stretch of the expressway, again, depicted by the orange boxes on the map. These are all within Poinciana Village 2.

transparent overlay.
Click image to enlarge
Example of a sound wall.

Marigold Avenue Interchange

As part of this project, new ramps will be added at Marigold Avenue making this a full diamond interchange.

The current ramps include an entrance ramp from Marigold Avenue to westbound SR 538 AND an exit ramp from eastbound SR 538 to Marigold Avenue. New ramps include an exit ramp from westbound SR 538 to Marigold Avenue AND an entrance ramp from Marigold Avenue to eastbound SR 538.

These ramps will make this a complete interchange.

transparent overlay.

Public Comments

We hope this information has been helpful. Don’t forget to leave your comments regarding the State Road 538 widening project. Comments must be submitted by Friday, August 7, 2020 in order to be entered in the public records. Just click on the envelope icon in the top corner of your screen or send your comments to Construction@CFXway.com.

Following this virtual public meeting, a copy of this presentation will be posted to the CFX website at bit.ly/SR538Widening.

transparent overlay.

Project Contact

If you have any questions before or during the construction of this project, please do not hesitate to contact public information officer Kevin Camara by phone or email.

Kevin Camara
Public Information Officer
Central Florida Expressway Authority

Phone: 407-383-5817

Email: Construction@CFXway.com

transparent overlay.

Thank You!

For more information on this project or any CFX project, please use the links below.

Thank you for joining us.

More information:
bit.ly/SR538Widening
CFXway.com