Welcome to the Central Florida Expressway Authority’s virtual Pre-Construction Information Meeting for Segment 3 of the State Road 417 Corridor Widening Projects: Landstar Boulevard to Boggy Creek Road.

For best performance, please view this slideshow in either Chrome or Internet Explorer.

Click image to enlarge
Intro graphic stating that video will be added soon.
transparent overlay.
Headshots of CFX team.

CFX Board

CFX is an independent agency of the state, governed by a Board of seven locally elected leaders and three governor appointees.

transparent overlay.
Map of State Road 417.

About CFX

State Road 417 is part of the 125-mile regional expressway system that is planned, designed, constructed, maintained and operated by CFX. CFX operates E-PASS, the first electronic toll collection system in Florida, with more than 500,000 E-PASS accounts.

The CFX limited access network, which serves 3 million residents and more than 75 million visitors, is fully funded by toll revenue; no tax dollars are used for CFX’s $2.7 billion 5-Year Work Plan.

transparent overlay.
Graphic with logo for State Road 417 and intro text.

Welcome

If you would like to ask a question or make a comment at any time, just click on the envelope icon in the top right corner of your screen. You will be able to type in your question or comment.

Public comment is essential in this process. Please try to get your comments regarding the information in this virtual meeting into CFX by July 31, 2020.

transparent overlay.

Title VI Compliance

This virtual meeting is being conducted without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to Title VI compliance by the Central Florida Expressway Authority may do so by contacting Kevin Camara, public information officer, by mail, phone or email.

Kevin Camara
Public Information Officer
4974 ORL Tower Road
Orlando, FL 32807

Phone: 407-383-5817

Email: Construction@CFXway.com

All inquiries or complaints will be handled according to CFX procedure and in a prompt and courteous manner.

transparent overlay.

Corridor Widening Overview

CFX is widening 22 miles of State Road 417 from International Drive to SR 528 to improve traffic flow on one of our system’s busiest expressways. Each day up to 95,000 vehicles travel this stretch of SR 417 and that number is expected to continue growing. This widening initiative is broken into five segments to minimize impacts to motorists.

Click image to enlarge
Map of corridor widening.
transparent overlay.

Segment 3 Map

During this meeting, we will focus on the third segment to be constructed: from Landstar Boulevard to Boggy Creek Road. This segment includes widening SR 417 from two lanes to three lanes in each direction for a total of six travel lanes. CFX is also adding wider median shoulders that can temporarily accommodate additional traffic during emergency response events, such as traffic accidents or hurricane evacuations. This segment includes 11 proposed sound walls.

Click image to enlarge
Map of corridor widening.
transparent overlay.
Click image to enlarge
Example of a sound wall.

Sound Wall Criteria

During design, a noise study—following state and federal guidelines—is conducted to determine noise impacts associated with the expressway widening. The study identifies noise sensitive sites such as homes, schools, churches, and recreational areas along the project corridor. For this project, sound walls have been considered for areas predicted to experience noise levels that reach or exceed 66 decibels or experience an increase of 15 decibels over existing noise levels. Additionally, the sound wall must provide at least a 5-decibel reduction to be considered feasible.

Sixty-six decibels would be slightly louder than heavy traffic 300 feet away; 15 decibels compares to the noise you would hear at night in a rural area. Think crickets. There is also consideration involving the cost-per-benefitted property.

transparent overlay.
Click image to enlarge
Line diagram of segement 1.

Sound Wall Survey Card

During the design process, property owners who are identified as benefitting from proposed sound walls, are asked to vote on whether they want the noise barriers. Ballots, like the one pictured here, have already been mailed to those people identified as benefitted property owners for this project.

transparent overlay.
Click image to enlarge
Line diagram of segement 1.

Traffic Noise Analysis

We have posted the Traffic Noise Analysis on the SR 417 Corridors Widening project web page. Please review it for details or contact us with questions. Now let’s review the proposed sound wall locations for this widening segment.

transparent overlay.

Sound Wall Typical Section

This is a sound wall typical section. It shows the standard placement of the sound wall located at the outside shoulder of the expressway. Beyond the sound wall, you see the fence along the CFX right of way. Sometimes a sound wall is built close to the right of way line.

Click image to enlarge
Graphic showing proposed height and placement of sound wall.
transparent overlay.

Segment 3: Landstar Boulevard to Boggy Creek Road

Construction on the third segment, from Landstar Boulevard to Boggy Creek Road, is expected to begin in the spring of 2021 and is expected to be complete in late 2023. In addition to the widening, there are 11 proposed sound walls along this stretch of the expressway, denoted by the dotted orange lines on the map. Next, we will zoom in and focus on each location where the sound walls are proposed from Landstar Boulevard to Boggy Creek Road.

Click image to enlarge
Map of corridor widening.
transparent overlay.

Proposed Sound Walls

Select a link to view proposed sound wall:
Meadow Woods, Portofino Meadows, and Chatham Place
Island Walk and Harbor Lakes
Meadow Creek
Somerset Park and Beacon Park
Somerset Crossings

Click image to enlarge
Map of corridor widening.
transparent overlay.

Public Comments

We hope this information has been helpful. Don’t forget to leave your comments regarding this segment of the State Road 417 Corridor Widening Projects. These comments must be submitted by July 31, 2020 in order to be entered in the public records. Just click on the envelope icon in the top corner of your screen or send your comments to Construction@CFXway.com.

Following this virtual public meeting, a copy of this presentation will be posted to the CFX website at CFXsr417corridorwideningprojects.com.

transparent overlay.

Project Contact

If you have any questions before or during the construction of this project, please do not hesitate to contact public information officer Kevin Camara by phone or email.

Kevin Camara
Public Information Officer
Central Florida Expressway Authority

Phone: 407-383-5817

Email: Construction@CFXway.com

transparent overlay.

Thank You!

For more information on this project or any CFX project, please use the links below.

Thank you for joining us.